Home Page    固废业绩    污泥处置业绩    Zhuzhou Sinoma Sludge Disposal Project
素材-9-株洲中材-污泥-微信图片_2026-04-08_110424_427
素材-9-株洲中材-污泥-微信图片_2026-04-08_110405_883
素材-9-株洲中材-污泥-微信图片_2026-04-08_110229_796

Zhuzhou Sinoma Sludge Disposal Project

The project has a daily processing capacity of 400 tons (with 80% moisture content) and an annual capacity of 124,000 tons, which can meet the citys sludge treatment needs; The sludge drying retrofit project will commence in 2025, utilizing high-temperature hot raw material from cement kilns to dry sludge. Upon completion, it will achieve a daily processing capacity exceeding 200 tons (with 50% moisture content), reducing coal consumption by 0.48 kg/t and cutting annual carbon emissions by approximately 1,500 tons.