-
About us
- Company Introduction
- Organization Structure
- Contact Us
-
News
-
Business
- Alternative Fuel Industry
- Environmental Engineering
-
Equipment
- Equipment R&D
- Equipment Integration
-
Cases
- Solid Waste Engineering Cases
- Water Engineering Cases
-
Workforce
-
About us
- Company Introduction
- Organization Structure
- Contact Us
-
News
-
Business
- Alternative Fuel Industry
- Environmental Engineering
-
Equipment
- Equipment R&D
- Equipment Integration
-
Cases
- Solid Waste Engineering Cases
- Water Engineering Cases
-
Workforce
Zhuzhou Sinoma Sludge Disposal Project
The project has a daily processing capacity of 400 tons (with 80% moisture content) and an annual capacity of 124,000 tons, which can meet the citys sludge treatment needs; The sludge drying retrofit project will commence in 2025, utilizing high-temperature hot raw material from cement kilns to dry sludge. Upon completion, it will achieve a daily processing capacity exceeding 200 tons (with 50% moisture content), reducing coal consumption by 0.48 kg/t and cutting annual carbon emissions by approximately 1,500 tons.
Copyright © SINOMA INTERNATIONAL ENVIRONMENTAL ENGINEERING CO., LTD.
Main Business