计时中 计时中
ꀅ English
  • English
  • 简体中文
  • About us
    • Company Introduction
    • Organization Structure
    • Contact Us
  • News
  • Business
    • Alternative Fuel Industry
    • Environmental Engineering
  • Equipment
    • Equipment R&D
    • Equipment Integration
  • Cases
    • Solid Waste Engineering Cases
    • Water Engineering Cases
  • Workforce
  • About us
    • Company Introduction
    • Organization Structure
    • Contact Us
  • News
  • Business
    • Alternative Fuel Industry
    • Environmental Engineering
  • Equipment
    • Equipment R&D
    • Equipment Integration
  • Cases
    • Solid Waste Engineering Cases
    • Water Engineering Cases
  • Workforce
ꂃ ꁹ
Home Page  ꄲ  Concentrated Brine
  • Solid waste case
  • Water case
  • Liangning Ganwang Water Treatment Project
    Summary: The upgraded facility will achieve a treatment capacity of 40,000 m³/d, featuring a newly constructed Fenton oxidation system, an A/O biological treatment system, a rotating disc filter with its associated fan house, and a chemical dosing room. The effluent will meet Class A Grade I water quality standards. With a total investment of 76.45 million yuan and a footprint of 9,538.46 square meters
    ¥ 0.00

    立即购买

  • Municipal Wastewater Treatment
  • Water Supply and Pipeline Network
  • Concentrated Brine Resource Utilization
  • Industrial Wastewater Treatment

Copyright © SINOMA INTERNATIONAL ENVIRONMENTAL ENGINEERING CO., LTD.

About us

 

  • Company Introduction
  • History
  • Organization Structure
  • Contact Us

Main Business

 

  • Alternative Fuel Industry
  • Environmental Engineering

Main Cases

  • Solid Waste Engineering Cases
  • Water Engineering Cases
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6