计时中 计时中
ꀅ English
  • English
  • 简体中文
  • About us
    • Company Introduction
    • Organization Structure
    • Contact Us
  • News
  • Business
    • Alternative Fuel Industry
    • Environmental Engineering
  • Equipment
    • Equipment R&D
    • Equipment Integration
  • Cases
    • Solid Waste Engineering Cases
    • Water Engineering Cases
  • Workforce
  • About us
    • Company Introduction
    • Organization Structure
    • Contact Us
  • News
  • Business
    • Alternative Fuel Industry
    • Environmental Engineering
  • Equipment
    • Equipment R&D
    • Equipment Integration
  • Cases
    • Solid Waste Engineering Cases
    • Water Engineering Cases
  • Workforce
ꂃ ꁹ
Home Page  ꄲ  Sludge case
  • Solid waste case
  • Water case
  • Zhuzhou Sinoma Sludge Disposal Project
    The project has a daily processing capacity of 400 tons (with 80% moisture content) and an annual capacity of 124,000 tons, which can meet the citys sludge treatment needs.
    The sludge drying retrofit project will commence in 2025, utilizing high-temperature hot raw material from cement kilns to dry sludge. Upon completion, it will achieve a daily processing capacity exceeding 200 tons (with 50% moisture content), reducing coal consumption by 0.48 kg/t and cutting annual carbon emissions by appro
    ¥ 0.00

    立即购买

  • Construction Waste Disposal
  • MSW Disposal
  • Alternative Fuel Disposal
  • Hazardous Waste Disposal
  • Fly Ash Disposal
  • Sludge Disposal

Copyright © SINOMA INTERNATIONAL ENVIRONMENTAL ENGINEERING CO., LTD.

About us

 

  • Company Introduction
  • History
  • Organization Structure
  • Contact Us

Main Business

 

  • Alternative Fuel Industry
  • Environmental Engineering

Main Cases

  • Solid Waste Engineering Cases
  • Water Engineering Cases
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6